View Single Post
Old 02-25-2007, 06:22 PM   #6
TonySMJC
 
TonySMJC's Avatar
 
Join Date: Aug 2006
Location: Brooklyn NY
Posts: 446
This years list

After a good long Bath Im going to touch up some anchor dings and put on some new chaffing gear where the rope burns the glass then some polish and wax

Since I painted the Trim last year Im ok for the coming season But the deck needs to be repainted and I hate the no skid I used on the Dash so thats gonna get a coat of something smooth.

Big Jobs

Im pulling the shaft and replacing it and while its out time for a cutlas bearing.
Im also tired of the existing stuffing box so Im going to go with a dripless and thats a project in itself.

Then its a full oil change including gear and hydrolic oil give all fittings and clamps the once over and splash were back in business

oh yea and if I can find all the proper parts Im going to install the auto pilot

If all goes well and the weathers not terrible 7 days 14 i I get stuck

If it goes as planed I will haul the last week of March and be in the 1st week of may


2 coats of bottom paint and im going to change all the underwater brass this year and cant forget the zinks that would be bad
__________________
Take a kid fishing, they are the future of our sport and our world

V.P New Angler Training , Chief Cook and Bottle Washer No B$ Pikers

Last edited by TonySMJC; 02-25-2007 at 06:24 PM. Reason: forgot
TonySMJC is offline   Reply With Quote